Wednesday, January 21, 2015

Lean-To Framing




Since we have a fairly significant elevation change from one side of the shop to the other we will have to build a ramp up to the doorway level (bottom of siding).  Nothing a few more tons of rock can't take care of.

Saturday, December 20, 2014

Barn Erection - Cont'd !

The week of December 14th marked yet another notable event.  The roof of the barn went on (at least partially) and we were able to park the tractor under shelter.  As a side note we actually got the tractor back from the local Massey Ferguson dealer located in Danville, VA.  Boone Tractor took our MF 240 tractor away on October 3 to perform some 'routine' fixes to common problems (such as hydraulics not working).  To make a long story short the three point hitch appears to be working correctly (for) now.  It is possible that our tractor may need an exorcist if the problem returns.  Everyone cross your fingers and pray for our MFer.

In the meantime the MF 240 and Elizabeth look very happy under the barn.


One of the Moon Creek Construction guys installing the roof sheathing
On stage 'left' Elizabeth and I began staining the T1-11 siding panels.  It is a lot easier to do this on the ground versus on the barn.  We went with Behr's Barn Red color which we think is going to look spectacular once it is all done.  The quintessential red barn look is what we were going for.
Eight down...
 42 more to go !


Sunday, October 19, 2014

Firewood Shed Started

Work began yet again on another new structure.  With all the wood cut from the road building project in the winter and spring we have a lot of firewood that needs to be stored to protect it from rot.  Architecturally it will be similar to the outhouse - log timber framed.  We started the pier footings for the corner poles using concrete forms and metal cleats that will be fastened to the bottom of the poles.


Water well in place and now awaiting pump and pressure tank installation