Farm progress and "farmer problems"

The wood shed is finally done!  We ended up going the easy route and used wire fence to be the walls which was easy, cheap and quick to install.  The added benefit of this material is that it allows complete air circulation from all directions.  Additionally we had reasoned that no one would be able to see the sides and rear wall anyway.  So the next thing is to get a few more pallets to stack the wood on, rent a splitter and make an all day event out getting the wood split and stacked.



It was a busy two days as we also took advantage of the dry conditions and had 36 more tons of crusher run delivered to finish up the barn floor leveling.  We ran in too a mechanical problem with the hydrostatic steering on the tractor causing us to shut down for awhile to fix the problem (sort of).  The steering ram cylinder came loose from vibration (all four bolts were still in place but the cap screws were not engaged!).  We managed to get them realigned and properly tightened without cross threading the screws.  This fix allowed me to continue using it but now I think there is either a problem with the steering pump pressure or the cylinders are bad.  At about the same time this happened Elizabeth had declared that the well pump had quit working or the well was dry!  After taking a short break and thinking about the issue I walked over and pressed the circuit breaker button on the generator and it reset.  Well pump not broken and well not dry. :)


Ramp nearly level with bottom of door now

Moving and leveling with FEL.  The Farmi was only along for the ride to counter weight the front end.  I should have put the rear blade on the for additional leveling capability.

Elizabeth was very busy planting tomatoes, zuchini, watermelon and ochra in the hugelkultur beds which we amended with topsoil removed from the wood shed.  The farm is coming along nicely!



The cute and adorable little fellow was found in the wood shed when we were excavating the topsoil


Saturday, January 31, 2015

Really coming together !

We headed up to Pelham for a 'short' day of work today.  Elizabeth was tied up in the morning at the "Y" doing a group fitness spin class so when she finished up we decided to pack "light" and take only the chainsaws and drill gear with us (no dogs to distract with walks and such) and aim to install the wood shed roof supports.  Last week we picked a nice straight 25 foot tall, ~16 year old Virginia pine tree with a diameter of about 5" from our nearby woodlot and dragged it with the MF 240 to our homestead to use as the rear roof header on the wood shed.  For the front we had a nice straight log from last year's road clearing already peeled and ready to go.

Even more exciting for us was that Moon Creek Construction Co got the metal roofing on the barn and the south attic window installed during the week.  





Here is some of the handiwork completed on the wood shed.  It has character to say the least.  Our plan is to tie the red barn/shop theme somehow into the wood shed...ideas ?





Wednesday, January 21, 2015

Lean-To Framing




Since we have a fairly significant elevation change from one side of the shop to the other we will have to build a ramp up to the doorway level (bottom of siding).  Nothing a few more tons of rock can't take care of.

Saturday, December 20, 2014

Barn Erection - Cont'd !

The week of December 14th marked yet another notable event.  The roof of the barn went on (at least partially) and we were able to park the tractor under shelter.  As a side note we actually got the tractor back from the local Massey Ferguson dealer located in Danville, VA.  Boone Tractor took our MF 240 tractor away on October 3 to perform some 'routine' fixes to common problems (such as hydraulics not working).  To make a long story short the three point hitch appears to be working correctly (for) now.  It is possible that our tractor may need an exorcist if the problem returns.  Everyone cross your fingers and pray for our MFer.

In the meantime the MF 240 and Elizabeth look very happy under the barn.


One of the Moon Creek Construction guys installing the roof sheathing
On stage 'left' Elizabeth and I began staining the T1-11 siding panels.  It is a lot easier to do this on the ground versus on the barn.  We went with Behr's Barn Red color which we think is going to look spectacular once it is all done.  The quintessential red barn look is what we were going for.
Eight down...
 42 more to go !


Saturday, December 13, 2014

Barn Erection Continues

The Moon Creek Construction team was hard at work by the end of the first week where they had placed the roof trusses and poured the concrete into the post holes for a permanent set.  Next step is to sheath the roof with plywood and then install the metal roof and wall girds.  Some additional re-grading work to take out some slope on the south end of the structure is needed to prepare it for the gravel base floor.  Maybe one day we'll upgrade it to a concrete floor.







Friday, September 12, 2014

Lawn Care and Log Splitting Help


August came and went quickly --as usual.  The grass got greener and longer forcing us to finally haul the lawn mower up to cut it.  Fortunately we had a little help one Saturday when our son and his friend decided to come along so they could earn a little money.  So we put their youthfulness to work splitting wood and mowing.  Our attention was also on the timber frame outhouse construction and there we got the boys to help us with notching of the logs with a mallet and chisel.

Scott cutting notch
Alex chiseling a notch
Alex hopping off the MF 240 after testing the new front tires

Saturday, January 4, 2014

January 3, 2014

We went up to the land today and finished piling up the brush we had cut. Also carried the concrete footings into the center of the lot for our outhouse. Had to take a few breaks along the way - they are really heavy! We also cut down some "hanging" trees so we would have some seasoned firewood to burn. It was really cold today, so we really enjoyed our thermos of hot tea :)

The road is really coming along

July 2013
The road to our homestead site
After years of searching for land we finally found the perfect homestead site in rural North Carolina. Close enough to the city to commute to work, yet quiet, remote and woodsy! We purchased 24 acres in two different parcels. A 10 acre parcel that will be managed as a woodlot, and a 14 acre parcel that will be transformed into our homestead. Both lots are mixed hardwood with some areas of pine. They were selectively logged several years ago, but there are still lots of very large trees on the land. The sites are hilly with several different ecosystems in each.




Wetland
Entrance to our homestead
One of my favorite ecosystems on our homestead lot is a wetland area that is adjacent to a year round creek at the back of the lot. It is not always wet, but floods after several days of rain.

Our goal for our homestead is to clear a road, then clear an area for a house, drive shed and barn, make terraced vegetable gardens and have some areas of pasture for goats and maybe a horse. We definitely plan to have chickens.  We have a lot of work to do!

 

 August 2013

We have spent many hours marking our property boundaries (wouldn't want to build a road on our neighbor's land!) and making trails. We have made some good use of the Husqvarna 343 FR brush cutter saw to clear saplings. There sure are a lot of ticks this year! The other vile creature that we have become acquainted with is the chigger. As former Canadians, we were not familiar with the chigger, but have become very well acquainted as we spend time at our beautiful land. We spent a lot of time walking the whole property so that we could find the best place to locate a home.



October 2013

 We made a plan for our homestead design and had the health department come out and approve where we wanted to locate our well and septic field. We located the house centrally but well above the flood plain of our triangular shaped lot. We are planning on practicing permaculture based on concepts presented by Ben Falk in an excellent book called The Resilient Farm and Homestead. Our ultimate goal is to live as sustainably as possible.

November 2013

First stage of road clearing
 We started clearing trees in preparation for road construction. We are clearing the trees ourselves to save money, and because it is just fun to be out working in the woods! This required the purchase of a bigger chainsaw (Husqvarna Rancher 450) as some of the trees are fairly large. We plan to heat our home with an efficient wood stove, so the cleared trees were bucked and stacked. We will have to move these piles of firewood to a sheltered woodshed later, after the road is built. We are really enjoying working without getting bitten by ticks and chiggers!
Road progress by end of November

We left the stumps so that a bulldozer can come in and push them out. The wood pile is growing. The next stage of the road will involve clearing lots of small brushy trees.

I think we need to start a new wood pile!

Hungry logger
Log shaving station

 December 2013

We had so many tall straight pines that it seemed a shame to cut them all into firewood. One of the side projects is preparing logs to use to build maybe a small log cabin, and also an outhouse. (Some of the workers are complaining about using the bushes...). I have been using a draw knife to shave the bark off these logs.

The outhouse will house a beautiful hand-made composting toilet based on the Loveable Loo plans.  Merry Christmas to me!
Composting toilet

January 2014

We are now in the final stages of road clearing. The rest of the work will be removing small trees and saplings. They are easy to cut down, but a lot of work to drag into piles some of them are entangled in vines and prickly stuff. We have some giant brush piles to deal with now. I think we need to rent a chipper.

This is not so much fun!



Taking a break to visit some of our beautiful beech trees!