Sunday, January 11, 2015

Pole Barn Windows Installed

After me being back to work the week of January 5th the Moon Creek Construction team was also hard at work again to add the siding and start the construction of the lean-to sheds on the gable ends.  You can see from the first photo below the posts are in and header up for the north side lean-to.  We have three big windows in place and the walk-in door goes on the south wall where the sun is shining on it.
Bright, sunny but cold morning (~10:00) January 10, 2015.

8' wide lean-to will be installed on this wall shortly

12' lean-to in progress on north side of shop - a cool 23 F morning.

Metal roof, 10x10 split siding door, walk-in door and attic storage floor boards are next installs...