Over the last week more progress on the pole barn was made. The roof sheeting and membrane was completed and the wall framing was started. A few truck loads of crusher run gravel was added for the floor base. Eventually we will pour a concrete floor but for now we'll live with a gravel floor.
No comments:
Post a Comment