This weekend we had 20 tons more gravel brought in to thicken up a few areas that didn't have sufficient depth. On this particular occasion the dump truck driver would not heed Scott's advice to back down
the driveway dropping and spreading the gravel. By this method he had
learned from one of the previous dump truck haulers (who was very good at operating his truck and spreading) that delivered last
month, that while tougher to navigate down a winding road like ours going backwards, he
would not get stuck in the soft gravel on the slope coming back up. Anyway this particular driver
went forward and dumped it evenly at about 4-5 inch thick. Sure enough he was unable to back up the hill because the gravel was too
loose and soft, as predicted. Eventually with a long series of backing and forwarding
maneuvers he compacted the road enough for his tires to get some traction and eased his rig up the slope but not without making a rutted mess. Once he was gone our attention went back to getting the tractor going so we could level and smooth the gravel with the loader.
Finally we figured out the problem with the starting system. The battery was not the issue after all but nonetheless we have a brand spanking new one installed that should last us a few years. Long story short we were able to bypass the neutral starting switch which we think is defective based, not only on our diagnostics, but also on the mechanic's testimony on a phone call back to the dealer in Florida who sold it to us. We did this with a screwdriver tip on the neutral switch terminal running to the solenoid over to the hot battery terminal of the solenoid. The engine fired up!
While warming up the machine we made an attempt to learn how the various functions of the machine worked when you pulled a lever or turned a knob. The PTO works as it should but the lift bars of the 3 point hitch were funky and didn't raise or lower (he thinks he diverted the hydraulic fluid from the auxillary lines that run the FEL back to the hydraulic storage tank when randomly tweaking the levers). No matter at this point Scott got to work crudely spreading the newly laid gravel by back dragging the FEL bucket from top of the driveway to the bottom. Actually he did a pretty good job grooming it with the bucket. See some of his handiwork here.
This is Caterpillar brand battery part# 153-5656. Supposedly they are higher quality battery's with anti-vibration design built into them for "Ag" applications. Below this you can see the solenoid where the (+) battery lead (heavy cable) connects. The blue terminal lead is the neutral switch line which is either faulty or the connection onto the solenoid is bad/inadequate.
Sunday, May 25, 2014
Monday, May 19, 2014
Tractor electrics on the fritz
We received the replacement hardware and installed the other half of the gate. However as you can see we still need to add the bracing on right side gate. Eventually we'll finish it but for a good part of the day we spent tinkering and learning how to operate our tractor.
Scott is presently researching an electrical issue with the tractor starting system. Sometimes it starts sometimes it doesn't. The battery seems to be holding a charge so next thing he says we need to look at are starter solenoid, battery cable connections and the (neutral) starting switch. Good thing the operator and shop manuals arrived last week. Nonetheless we were able to practice driving up and down the road a few times and put it to "work" by carrying bales of straw down the hill to where we re-seeded. I also installed some grass seed blankets in the ditch and pegged them with sticks to prevent seed wash-out in future rain storms.
Scott is presently researching an electrical issue with the tractor starting system. Sometimes it starts sometimes it doesn't. The battery seems to be holding a charge so next thing he says we need to look at are starter solenoid, battery cable connections and the (neutral) starting switch. Good thing the operator and shop manuals arrived last week. Nonetheless we were able to practice driving up and down the road a few times and put it to "work" by carrying bales of straw down the hill to where we re-seeded. I also installed some grass seed blankets in the ditch and pegged them with sticks to prevent seed wash-out in future rain storms.
Sunday, May 11, 2014
A road and a tractor!
February and March 2014
Tree clearing in preparation for the road continues. We have to work quickly so that we can get the road put in by mid May. If we wait much longer than that then we won't be able to seed the sides of the road and the ditches with grass to prevent erosion.Craig and Devon Tomlin came to visit.
We are bucking a lot of the logs to be used as firewood, but also leaving the straight trees in 10-12 ft lengths to be used to make a small log cabin. These are too heavy for us to move!
We have cleared about 500 ft of road length, 12 ft wide and are ready for the bulldozer to remove the stumps and install the roadbed.
Late April 2014
Scott laid down a 6.5 oz/sq. yd. polypropylene geo-textile material from US Fabrics after the road was shaped and before the gravel was delivered. This separates the gravel from the sub-grade and makes for a more stable, long lasting gravel road.
We had gravel delivered from the local quarry near Pelham. We used crusher run grade called Virginia 026 which is a crushed angular granite rock with quite a bit of fines to consolidate it well.
So far we have had four truckloads of rock delivered, but we need a few more! After we get our tractor we are going to spread what has been delivered a bit better and then get at least another 4-5 loads (~20 tons/truckload). Immediately after the excavation we spread about 75 lbs of grass seed and 30 bales of straw on the cleared areas to begin the "healing" of the cleared bare soil areas.
May 2014
The grass seed is sprouting! I was a bit worried about it because we had a torrential rain storm that dropped about 3" right after we spread it, and we had to go back and add a bit more and re-deploy some of the straw. However, Cherokee did a great job with the road, and the erosion was minimal. Hoping that May brings enough rain to get it established before the heat of summer arrives. Still waiting on our tractor so that we can spread gravel around and move logs on our own.The most recent project at the land has been to install a front gate. Now that the road is passable we don't want curious visitors driving down our road and stealing our firewood, and later on, our tractor and whatever else we decide to leave there.
Sunday, January 19, 2014
Scotty makes his first board out of a Virginia pine log using the Haddon Lumbermaker
Scotty went up to do some more road clearing yesterday, and try out the Haddon lumber maker that he got for Christmas. He made a mighty fine plank that will be used in the construction of our out house!
Sunday, January 5, 2014
Saturday, January 4, 2014
January 3, 2014
We went up to the land today and finished piling up the brush we had cut. Also carried the concrete footings into the center of the lot for our outhouse. Had to take a few breaks along the way - they are really heavy! We also cut down some "hanging" trees so we would have some seasoned firewood to burn. It was really cold today, so we really enjoyed our thermos of hot tea :)| The road is really coming along |
July 2013
| The road to our homestead site |
| Wetland |
| Entrance to our homestead |
Our goal for our homestead is to clear a road, then clear an area for a house, drive shed and barn, make terraced vegetable gardens and have some areas of pasture for goats and maybe a horse. We definitely plan to have chickens. We have a lot of work to do!
August 2013
We have spent many hours marking our property boundaries (wouldn't want to build a road on our neighbor's land!) and making trails. We have made some good use of the Husqvarna 343 FR brush cutter saw to clear saplings. There sure are a lot of ticks this year! The other vile creature that we have become acquainted with is the chigger. As former Canadians, we were not familiar with the chigger, but have become very well acquainted as we spend time at our beautiful land. We spent a lot of time walking the whole property so that we could find the best place to locate a home.
October 2013
We made a plan for our homestead design and had the health department come out and approve where we wanted to locate our well and septic field. We located the house centrally but well above the flood plain of our triangular shaped lot. We are planning on practicing permaculture based on concepts presented by Ben Falk in an excellent book called The Resilient Farm and Homestead. Our ultimate goal is to live as sustainably as possible.
November 2013
| First stage of road clearing |
We started clearing trees in preparation for road construction. We are clearing the trees ourselves to save money, and because it is just fun to be out working in the woods! This required the purchase of a bigger chainsaw (Husqvarna Rancher 450) as some of the trees are fairly large. We plan to heat our home with an efficient wood stove, so the cleared trees were bucked and stacked. We will have to move these piles of firewood to a sheltered woodshed later, after the road is built. We are really enjoying working without getting bitten by ticks and chiggers!
| Road progress by end of November |
We left the stumps so that a bulldozer can come in and push them out. The wood pile is growing. The next stage of the road will involve clearing lots of small brushy trees.
| I think we need to start a new wood pile! |
| Hungry logger |
| Log shaving station |
December 2013
We had so many tall straight pines that it seemed a shame to cut them all into firewood. One of the side projects is preparing logs to use to build maybe a small log cabin, and also an outhouse. (Some of the workers are complaining about using the bushes...). I have been using a draw knife to shave the bark off these logs.The outhouse will house a beautiful hand-made composting toilet based on the Loveable Loo plans. Merry Christmas to me!
| Composting toilet |
January 2014
We are now in the final stages of road clearing. The rest of the work will be removing small trees and saplings. They are easy to cut down, but a lot of work to drag into piles some of them are entangled in vines and prickly stuff. We have some giant brush piles to deal with now. I think we need to rent a chipper.| This is not so much fun! |
| Taking a break to visit some of our beautiful beech trees! |